Downtown Tucson

Return to Homepage

Return to Downtown


Other Sites

Heliograph Peak
Mount Lemmon
Elephant Head
Mule Mountain
Dragoon
Dark Canyon

Installation Day for the New Downtown Rack
Backing upOpening Door
KB7WFO's truck arrives at the site.KB7RFI directing traffic while N7CK opens the building door.
Moving RackGetting rack in building
All it takes is a little pushing and shoving...and the rack slides in the door!
Preliminary CheckoutRFI and Rack
We did a preliminary checkout on the microwave signal before removing the old racks. KB7RFI moving the 440 preamp, duplexer and cavity into the new rack
Autopatch checkoutOther end of autopatch
Final checkout of the autopatch means . . .a long distance call to KB7WFO in the other room!
Power up!Out with the old
Powering up the microwaveThe old racks head off into the sunset.

Return to Homepage

Return to
Downtown